Penn State’s new Chemical and Biomedical Engineering Building was topped off on 9/26/17 at 128’-0 tall – eight months after ground breaking.
Penn State’s new Chemical and Biomedical Engineering Building was topped off on 9/26/17 at 128’-0 tall – eight months after ground breaking.
Leave A Comment
You must be logged in to post a comment.